Agenda · Retrospective
Portent's 60-minute blameless post-mortem: set the tone, recap the project and outcome, discuss for 40 minutes, leave with actions.
Opens in the builder. No sign-up to try it; free forever to run it live.
By the end of this meeting: The team agrees what worked and what didn't, without blame, and leaves with actions it can carry out.
01Inside
6 blocks in 60 minutes, in order, with the facilitator's tips.
02Why it works
A 5-minute check-in: everyone sends a mood and one word from their phone, and it shows on their tile in the call. People who speak early speak again.
5 minutes of updates with a visible clock. In a video call the speaker is spotlighted and the room is muted, so nobody talks over them.
Everyone types at once and ideas land on the shared screen together. The quiet person's idea gets the same space as everyone else's.
25 minutes of open floor with a countdown everyone can see, and a talk-balance meter so the loudest voice doesn't take all of it.
Decisions and actions are read back, the summary is already written, and a finish on time earns the confetti.
03In the room
The shared screen, every phone and the summary afterwards, drawn from this agenda.
On the shared screen
Each block runs on its own timer on the shared screen, and the video call changes with each block, so the meeting keeps to time.
On every phone
People scan the code or tap their invite and answer in the phone's browser. No app to install, no account to make.
Afterwards
Decisions and actions are captured as they're said. When the meeting ends, everyone gets the summary, and one link shares it.
04How to run it
Hold it right after the project ends, before details evaporate.
Send a short questionnaire beforehand so people arrive with their points.
Set a no-blame tone at the start and hold to it.
Keep laptops closed and spend most of the hour on team discussion.
Finish with specific, actionable takeaways and share the results afterwards.
05Questions
Still deciding?
Run your next meeting on it. Every new account gets Pro free for 14 days, no card.
About 60 minutes in Portent's format: 5 to set the tone, 5 to recap the project and outcome, 40 of discussion, and 10 for takeaways.
Right after the project ends. Waiting too long means project details evaporate.
Set a no-blame tone at the start, focus discussion on what worked and what didn't, and end with actions rather than fault.
The structure, timings and tips on this page come from these sources.
Keep going
Open it in the builder, adjust the minutes, press Run live. Everyone joins with a scan.
Free forever · Pro free for 14 days · No card needed · Guests never sign up
Agency project retrospective / post-mortem60 minutes · Free template