  1. Home/
  2. Templates/
  3. Change control board meeting

Agenda · Reviews & approvals

Change control board meeting

Review engineering change requests one at a time: impact on cost, schedule, quality and safety, a phone vote per request and a written decision record.

60 minutes8 blockspro Runs with Pro
Use this template

Free to open and edit. Running it live needs Pro, free for 14 days on every new account.

60 min · 8 blocks, drawn to scale Fits exactly
  1. Quorum, docket and decision rules, 3 minutes 3
  2. Status of changes approved last time, 5 minutes 5
  3. Change request 1: what, why and the requester's case, 5 minutes 5
  4. Impact matrix: cost, schedule, quality, safety, interfaces, 10 minutesDiscuss 10
  5. Decision on change request 1, 2 minutes 2
  6. Change requests 2 to 4: impact and decision, 25 minutesDiscuss 25
  7. Decision record: conditions, owners, effective point, 6 minutes 6
  8. Notify requesters and update the change log, 4 minutes 4
015304560 min
  1. +0′Quorum, docket and decision rules3 minInfo
  2. +3′Status of changes approved last time5 minFollow-up
  3. +8′Change request 1: what, why and the requester's case5 minInfo
  4. +13′Impact matrix: cost, schedule, quality, safety, interfaces10 minDiscuss
  5. +23′Decision on change request 1Your decision on this change request?2 minVote
  6. +25′Change requests 2 to 4: impact and decision25 minDiscuss
2 more blocks · the full run sheet

In short

A change control board (CCB) is the group that approves or rejects changes to a controlled baseline such as drawings, specifications or a schedule. This 60-minute agenda reviews engineering change requests one at a time with an impact matrix and a vote, then records conditions, owners and the effective point for each decision.

Time
60 minutes
People
Board members, change requesters
Decision options
Approve, conditions, reject, defer, analyze
Plan
Pro
Made forConstructionManufacturingSoftware & product· Updated October 4, 2026
Share

01Inside

The full run sheet

By the end of this meeting, every change request on the docket has an impact assessment and a recorded decision: approved, approved with conditions, rejected, deferred or sent back. Every block in order, with the facilitator's tips.

60 min · 8 blocks, drawn to scale Fits exactly
  1. Quorum, docket and decision rules, 3 minutes 3
  2. Status of changes approved last time, 5 minutes 5
  3. Change request 1: what, why and the requester's case, 5 minutes 5
  4. Impact matrix: cost, schedule, quality, safety, interfaces, 10 minutesDiscuss 10
  5. Decision on change request 1, 2 minutes 2
  6. Change requests 2 to 4: impact and decision, 25 minutesDiscuss 25
  7. Decision record: conditions, owners, effective point, 6 minutes 6
  8. Notify requesters and update the change log, 4 minutes 4
015304560 min
  1. +0′Quorum, docket and decision rulesTip: Confirm the members needed to decide are present. Read the docket in priority order: safety and regulatory changes first.3 minInfo
  2. +3′Status of changes approved last timeTip: Were approved changes implemented and documents updated? A change isn't closed until the drawings, specs or baseline are revised.5 minFollow-up
  3. +8′Change request 1: what, why and the requester's caseTip: Two minutes from the requester: the problem, the proposed change and what happens if we do nothing.5 minInfo
  4. +13′Impact matrix: cost, schedule, quality, safety, interfacesTip: Go across every row: cost, schedule, technical performance, safety and compliance, documents affected, other teams and suppliers, inventory and work in progress. Blank rows are unknowns, not zeros.10 minDiscuss
  5. +23′Decision on change request 1Your decision on this change request?2 minVote
  6. +25′Change requests 2 to 4: impact and decisionTip: Same pattern for each: requester's case, impact matrix, vote. Duplicate the blocks if your docket is long, or move low-impact changes to an expedited list.25 minDiscuss
  7. +50′Decision record: conditions, owners, effective pointTip: For each approved change: the conditions, who implements it, and the effective point (a date, serial number, lot or area of the work).6 minDecide
  8. +56′Notify requesters and update the change log4 minWrap-up

02Why it works

Built so the change control board meeting ends on time, with everyone in it.

  • Updates stay short

    8 minutes of updates with a visible clock. In a video call the speaker is spotlighted and the room is muted, so nobody talks over them.

  • Discussion with a clock

    35 minutes of open floor with a countdown everyone can see, and a talk-balance meter so the loudest voice doesn't take all of it.

  • A vote the whole room sees

    One tap each on a phone, live bars on the screen. A tick shows who has voted, never what they chose.

  • It ends in a decision

    Capture the decision and its owner with one click while it's said. It lands in the summary, word for word.

  • Wraps up on time

    Decisions and actions are read back, the summary is already written, and a finish on time earns the confetti.

03In the room

What happens when you run it

The shared screen, every phone and the summary afterwards, drawn from this template.

  • LiveChange control board1 of 8

    Info

    Quorum, docket and decision rules

    2:

    On the shared screen

    A countdown for every block

    Each block runs on its own timer on the shared screen, and the video call changes with each block, so the meeting keeps to time.

  • 10:02

    Vote

    Your decision on this change request?

    • Approve
    • Approve with conditions
    • Reject
    • Defer

    On every phone

    Vote from every phone

    People scan the code or tap their invite and answer in the phone's browser. No app to install, no account to make.

  • Change control board

    Summary

    Sent

    In short

    Decisions

    Decision record: conditions, owners, effective point

    Actions

    Afterwards

    A summary that writes itself

    Decisions and actions are captured as they're said. When the meeting ends, everyone gets the summary, and one link shares it.

04How to run it

How to run this meeting, step by step

  1. 1

    Circulate the docket and each change request with its impact assessment at least two days before the board.

  2. 2

    Take safety and regulatory changes first, then by impact. Send incomplete requests back rather than debating them.

  3. 3

    Walk every row of the impact matrix for each request; a blank row means nobody has checked.

  4. 4

    Vote on each request separately. Agendiq's summary records each decision with the votes for the change log.

  5. 5

    Close only when every approved change has an owner and an effective point, and tell requesters the outcome the same day.

05Questions

Questions people ask

Something else? Browse all agendas or open this one and change anything you like.

Still deciding?

Run your next meeting on it. Every new account gets Pro free for 14 days, no card.

  • Free forever after the trial
  • Your guests never sign up
  • Calls are never recorded
Start free
What does a change control board do?

It reviews proposed changes to a controlled baseline, assesses their impact on cost, schedule, quality and safety, and decides whether to approve, reject or defer them, keeping a record of each decision.

What is an engineering change request?

A formal request to change a released design, drawing, specification or process. It describes the problem, the proposed change and the reason, and the CCB assesses its impact before deciding.

Who sits on a change control board?

Representatives of the functions a change affects, such as engineering, quality, production or construction, procurement and the project manager, with a chair who has decision authority.

Keep going

Goes well with

  • All agendas
  • Templates for construction
  • Run sheet75′
    8 blocks
    • 0:00Purpose, milestone and the decision we need today
    • 0:03Criteria recap: brief, budget, codes and standards
    • 0:08Design walkthrough by the lead designer
    • 0:23Review comments: issue, location, suggestion
    +4 more
    Agenda·Constructionpro
    Design review meetingA 75-minute milestone design review: criteria recap, walkthrough, a live comments board sorted by severity, an outcome vote and a decision record. 75 min
  • Run sheet120′
    10 blocks
    • 0:00Entrance criteria: are we ready to hold this review?
    • 0:05Objectives and success criteria for this review
    • 0:10Requirements trace: each requirement to design and verificat
    • 0:25Design walkthrough by subsystem
    +6 more
    Agenda·Constructionpro
    PDR and CDR design reviewsA two-hour preliminary or critical design review: entrance criteria, requirements trace, subsystem walkthrough, RID disposition and a board call. 120 min
  • Presentation·Constructionstudio
    Architecture presentation templateA client design review deck: brief, site, concept, options, materials and next steps, with live feedback polls so every stakeholder weighs in. 45 min 15 slides
  • Run sheet75′
    11 blocks
    • 0:00Safety: incidents, near misses, upcoming high-risk work
    • 0:05Open items from the last meeting
    • 0:10Schedule: progress against baseline, critical path, look-ahe
    • 0:20Are we on track for the next milestone?
    +7 more
    Agenda·Constructionpro
    OAC meeting agendaThe weekly owner-architect-contractor meeting: safety, schedule, RFI and submittal logs, change events and a quick confidence vote on the next milestone. 75 min
  • Run sheet60′
    9 blocks
    • 0:00Safety: the hazard every crew should know about this week
    • 0:05Incidents, near misses and inspection findings since last we
    • 0:09Open items from last week
    • 0:14Schedule: where each trade stands against the plan
    +5 more
    Agenda·ConstructionFree
    Construction progress meeting agendaA weekly site meeting with every foreman: safety first, schedule by trade, a three-week look-ahead, coordination and a ready-for-next-week check. 60 min
  • Run sheet90′
    10 blocks
    • 0:00What closed out means under this contract
    • 0:03Substantial completion status and certificate
    • 0:10Punch list: open items by trade and area
    • 0:25Turnover documents: O&M manuals, warranties, record drawings
    +6 more
    Agenda·Constructionpro
    Construction closeout meetingA 90-minute closeout meeting that works through the turnover checklist, punch list and financial closeout, then captures lessons learned. 90 min
  • Run sheet10′
    5 blocks
    • 0:00Today's topic and why it matters on this site
    • 0:02Questions to the crew
    • 0:05Has anyone dealt with this hazard?
    • 0:07One hazard you'll watch for today
    +1 more
    Agenda·ConstructionFree
    Toolbox talk (tailgate meeting)A short crew safety talk on one topic tied to this site: ask questions, share experiences, and follow up on anything you can't answer. 10 min
  • Run sheet15′
    8 blocks
    • 0:00What is your task today? Break it into steps
    • 0:02What hazards are involved in each step?
    • 0:05Controls, where they are, who implements them; permit status
    • 0:08What other crews are working around you?
    +4 more
    Agenda·ConstructionFree
    Pre-task planning (PTP) meetingCPWR's pre-task planning questions before work starts (steps, hazards, controls, nearby crews, readiness), plus an end-of-shift post-task review. 15 min

Open it, make it yours, run it live.

Change anything in the editor. When you're ready, press Run live: everyone joins with a scan and answers on their phone.

Use this template More agendas

Free forever · Pro free for 14 days · No card needed · Guests never sign up

agendIQ

Meetings are boring. Let's make them fun. Plan the agenda, run it live with a call that follows it, and leave with decisions.

Product

  • Plan a meeting
  • How it works
  • Video calls
  • Interactive presentations
  • Meeting timer
  • Pricing
  • Integrations
  • API and webhooks
  • Join with a code
  • Sign in

Templates

  • Presentation templates
  • Games & quizzes
  • Workshop templates
  • Meeting kits
  • Weekly team meeting agenda
  • Retrospective meeting agenda
  • 1:1 meeting agenda
  • All 507 templates

Free tools

  • AI agenda maker
  • Meeting cost calculator
  • Video meetings
  • All free tools
  • Online timer
  • Wheel spinner
  • Random team generator
  • Word cloud generator
  • AI quiz generator
  • Question bank

Guides

  • Meeting games & icebreakers
  • How to write a meeting agenda
  • How to run effective meetings
  • Meeting minutes & action items
  • AI meeting assistant

Compare

  • Mentimeter alternative
  • Slido alternative
  • Free video calls compared
  • Google Meet alternative
  • Zoom alternative
  • Miro alternative
  • Otter.ai alternative
  • Kahoot alternatives
  • Gamma alternative

Trust

  • Privacy Policy
  • Terms of Service
  • Calls are never recorded