  1. Home/
  2. Templates/
  3. Change control board meeting
AgendaConstructionReviews & approvals

Change control board meeting

60 minutes 8 blockspro Runs with Pro

Review engineering change requests one at a time: impact on cost, schedule, quality and safety, a phone vote per request and a written decision record.

Use this template See inside

Free to open and edit. Running it live needs Pro, free for 14 days on every new account.

Share
60 min · 8 blocks, drawn to scale Fits exactly
  1. Quorum, docket and decision rules, 3 minutes 3
  2. Status of changes approved last time, 5 minutes 5
  3. Change request 1: what, why and the requester's case, 5 minutes 5
  4. Impact matrix: cost, schedule, quality, safety, interfaces, 10 minutesDiscuss 10
  5. Decision on change request 1, 2 minutes 2
  6. Change requests 2 to 4: impact and decision, 25 minutesDiscuss 25
  7. Decision record: conditions, owners, effective point, 6 minutes 6
  8. Notify requesters and update the change log, 4 minutes 4
015304560 min
  1. +0′Quorum, docket and decision rulesTip: Confirm the members needed to decide are present. Read the docket in priority order: safety and regulatory changes first.3 minInfo
  2. +3′Status of changes approved last timeTip: Were approved changes implemented and documents updated? A change isn't closed until the drawings, specs or baseline are revised.5 minFollow-up
  3. +8′Change request 1: what, why and the requester's caseTip: Two minutes from the requester: the problem, the proposed change and what happens if we do nothing.5 minInfo
  4. +13′Impact matrix: cost, schedule, quality, safety, interfacesTip: Go across every row: cost, schedule, technical performance, safety and compliance, documents affected, other teams and suppliers, inventory and work in progress. Blank rows are unknowns, not zeros.10 minDiscuss
  5. +23′Decision on change request 1Your decision on this change request?2 minVote
  6. +25′Change requests 2 to 4: impact and decisionTip: Same pattern for each: requester's case, impact matrix, vote. Duplicate the blocks if your docket is long, or move low-impact changes to an expedited list.25 minDiscuss
  7. +50′Decision record: conditions, owners, effective pointTip: For each approved change: the conditions, who implements it, and the effective point (a date, serial number, lot or area of the work).6 minDecide
  8. +56′Notify requesters and update the change log4 minWrap-up

In short

A change control board (CCB) is the group that approves or rejects changes to a controlled baseline such as drawings, specifications or a schedule. This 60-minute agenda reviews engineering change requests one at a time with an impact matrix and a vote, then records conditions, owners and the effective point for each decision.
Time
60 minutes
People
Board members, change requesters
Decision options
Approve, conditions, reject, defer, analyze
Plan
Pro

Updated October 4, 2026

What's inside

By the end of this meeting, every change request on the docket has an impact assessment and a recorded decision: approved, approved with conditions, rejected, deferred or sent back. The full agenda is drawn to scale above: every block has its own timer when you run it live.

How to run it

  1. 1Circulate the docket and each change request with its impact assessment at least two days before the board.
  2. 2Take safety and regulatory changes first, then by impact. Send incomplete requests back rather than debating them.
  3. 3Walk every row of the impact matrix for each request; a blank row means nobody has checked.
  4. 4Vote on each request separately. Agendiq's summary records each decision with the votes for the change log.
  5. 5Close only when every approved change has an owner and an effective point, and tell requesters the outcome the same day.

Questions people ask

What does a change control board do?
It reviews proposed changes to a controlled baseline, assesses their impact on cost, schedule, quality and safety, and decides whether to approve, reject or defer them, keeping a record of each decision.
What is an engineering change request?
A formal request to change a released design, drawing, specification or process. It describes the problem, the proposed change and the reason, and the CCB assesses its impact before deciding.
Who sits on a change control board?
Representatives of the functions a change affects, such as engineering, quality, production or construction, procurement and the project manager, with a chair who has decision authority.

Run it with your group

pro
  • A timer for every block on the shared screen
  • Results, decisions and actions in the summary
Use this template

Free to open and edit. Running it live needs Pro, free for 14 days on every new account.

Goes well with

All agendas
    • Purpose, milestone and the decision we need today3′
    • Criteria recap: brief, budget, codes and standards5′
    • Design walkthrough by the lead designer15′
    • Review comments: issue, location, suggestion15′
    proAgenda·Construction
    Design review meetingA 75-minute milestone design review: criteria recap, walkthrough, a live comments board sorted by severity, an outcome vote and a decision record. 75 min
    • Entrance criteria: are we ready to hold this review?5′
    • Objectives and success criteria for this review5′
    • Requirements trace: each requirement to design and verificat15′
    • Design walkthrough by subsystem30′
    proAgenda·Construction
    PDR and CDR design reviewsA two-hour preliminary or critical design review: entrance criteria, requirements trace, subsystem walkthrough, RID disposition and a board call. 120 min
  • Riverside Library: schematic design review

    Design review with the client team · Your feedback, live from your phone

    studioPresentation·Construction
    Architecture presentation templateA client design review deck: brief, site, concept, options, materials and next steps, with live feedback polls so every stakeholder weighs in. 45 min 15 slides
    • Safety: incidents, near misses, upcoming high-risk work5′
    • Open items from the last meeting5′
    • Schedule: progress against baseline, critical path, look-ahe10′
    • Are we on track for the next milestone?3′
    proAgenda·Construction
    OAC meeting agendaThe weekly owner-architect-contractor meeting: safety, schedule, RFI and submittal logs, change events and a quick confidence vote on the next milestone. 75 min
    • Safety: the hazard every crew should know about this week5′
    • Incidents, near misses and inspection findings since last we4′
    • Open items from last week5′
    • Schedule: where each trade stands against the plan10′
    FreeAgenda·Construction
    Construction progress meeting agendaA weekly site meeting with every foreman: safety first, schedule by trade, a three-week look-ahead, coordination and a ready-for-next-week check. 60 min
    • What closed out means under this contract3′
    • Substantial completion status and certificate7′
    • Punch list: open items by trade and area15′
    • Turnover documents: O&M manuals, warranties, record drawings15′
    proAgenda·Construction
    Construction closeout meetingA 90-minute closeout meeting that works through the turnover checklist, punch list and financial closeout, then captures lessons learned. 90 min
    • Today's topic and why it matters on this site2′
    • Questions to the crew3′
    • Has anyone dealt with this hazard?2′
    • One hazard you'll watch for today1′
    FreeAgenda·Construction
    Toolbox talk (tailgate meeting)A short crew safety talk on one topic tied to this site: ask questions, share experiences, and follow up on anything you can't answer. 10 min
    • What is your task today? Break it into steps2′
    • What hazards are involved in each step?3′
    • Controls, where they are, who implements them; permit status3′
    • What other crews are working around you?2′
    FreeAgenda·Construction
    Pre-task planning (PTP) meetingCPWR's pre-task planning questions before work starts (steps, hazards, controls, nearby crews, readiness), plus an end-of-shift post-task review. 15 min

Open it, make it yours, run it live.

Change anything in the editor. When you're ready, press Present: everyone joins with a scan and answers on their phone.

  • Free forever
  • Pro free for 14 days
  • No card needed
  • Guests never need an account
Use this template More agendas
agendIQ

Meetings are boring. Let's make them fun. Plan the agenda, run it live with a call that follows it, and leave with decisions.

Product

  • Plan a meeting
  • How it works
  • Video calls
  • Interactive presentations
  • Meeting timer
  • Pricing
  • Join with a code
  • Sign in

Templates

  • Presentation templates
  • Games & quizzes
  • Workshop templates
  • Meeting kits
  • Weekly team meeting agenda
  • Retrospective meeting agenda
  • 1:1 meeting agenda
  • All 507 templates

Free tools

  • AI agenda maker
  • Meeting cost calculator
  • Video meetings
  • All free tools
  • Online timer
  • Wheel spinner
  • Random team generator
  • Word cloud generator
  • AI quiz generator

Guides

  • Meeting games & icebreakers
  • How to write a meeting agenda
  • How to run effective meetings
  • Meeting minutes & action items

Compare

  • Mentimeter alternative
  • Slido alternative
  • Free video calls compared
  • Google Meet alternative
  • Zoom alternative
  • Miro alternative
  • Otter.ai alternative
  • Kahoot alternatives
  • Gamma alternative

Trust

  • Privacy Policy
  • Terms of Service
  • Calls are never recorded
  • Votes stay anonymous
  • Data stored in the EU
© 2026 Agendiq30 sectors · 507 templates · Participants never need an account