agendIQ
TemplatesPricing
Sign inStart free

Product

  • Agenda builder
  • Live meetings
  • Video calls
  • Chair
  • Presentations
  • Integrations
  • Notes for everyone

Free tools

  • Agenda maker
  • Online timer
  • Wheel spinner
  • Team generator
  • Word cloud generator
  • AI quiz generator
  • Meeting cost calculator
  • Meeting games
  • Guides
  • All free tools
  • Templates
  • Pricing
Sign inStart free

Free forever · Pro free for 14 days. No card needed.

  1. Home/
  2. Templates/
  3. PDR and CDR design reviews

Agenda · Reviews & approvals

PDR and CDR design reviews

A two-hour preliminary or critical design review: entrance criteria, requirements trace, subsystem walkthrough, RID disposition and a board call.

120 minutes10 blockspro Runs with Pro
Use this template

Free to open and edit. Running it live needs Pro, free for 14 days on every new account.

120 min · 10 blocks, drawn to scale Fits exactly
  1. Entrance criteria: are we ready to hold this review?, 5 minutes 5
  2. Objectives and success criteria for this review, 5 minutes 5
  3. Requirements trace: each requirement to design and verification, 15 minutes 15
  4. Design walkthrough by subsystem, 30 minutesInfo 30
  5. Interfaces and integration, 10 minutes 10
  6. Break, 10 minutes 10
  7. Risks, margins and open trades, 15 minutes 15
  8. Review item discrepancies (RIDs): disposition each one, 15 minutes 15
  9. Board recommendation, 5 minutes 5
  10. Action items, owners and close dates, 10 minutes 10
0306090120 min
  1. +0′Entrance criteria: are we ready to hold this review?5 minInfo
  2. +5′Objectives and success criteria for this review5 minInfo
  3. +10′Requirements trace: each requirement to design and verification15 minInfo
  4. +25′Design walkthrough by subsystem30 minInfo
  5. +55′Interfaces and integration10 minDiscuss
  6. +65′Break10 minBreak
4 more blocks · the full run sheet

In short

A preliminary design review (PDR) checks that a design meets its requirements with acceptable risk before detailed design starts; a critical design review (CDR) checks it is mature enough to build and test. This two-hour agenda covers entrance criteria, the requirements trace, subsystem walkthroughs, risks, RID disposition and the board's recommendation.

Time
2 hours
People
Review board, subsystem leads
Works for
PDR, CDR and delta reviews
Plan
Pro
Made forConstructionManufacturingSoftware & product· Updated October 4, 2026
Share

01Inside

The full run sheet

By the end of this meeting, the board has decided whether the success criteria are met and every review item discrepancy has a disposition, owner and close date. Every block in order, with the facilitator's tips.

120 min · 10 blocks, drawn to scale Fits exactly
  1. Entrance criteria: are we ready to hold this review?, 5 minutes 5
  2. Objectives and success criteria for this review, 5 minutes 5
  3. Requirements trace: each requirement to design and verification, 15 minutes 15
  4. Design walkthrough by subsystem, 30 minutesInfo 30
  5. Interfaces and integration, 10 minutes 10
  6. Break, 10 minutes 10
  7. Risks, margins and open trades, 15 minutes 15
  8. Review item discrepancies (RIDs): disposition each one, 15 minutes 15
  9. Board recommendation, 5 minutes 5
  10. Action items, owners and close dates, 10 minutes 10
0306090120 min
  1. +0′Entrance criteria: are we ready to hold this review?Tip: Check the data package was delivered on time and the prerequisites are closed. If not, say so now rather than holding a review that can't pass.5 minInfo
  2. +5′Objectives and success criteria for this reviewTip: PDR: the preliminary design meets the requirements with acceptable risk and is ready for detailed design. CDR: the design is mature enough to proceed to fabrication, assembly, integration and test.5 minInfo
  3. +10′Requirements trace: each requirement to design and verificationTip: Show the traceability matrix. Spend time on requirements without a design element or without a verification method; those are the gaps.15 minInfo
  4. +25′Design walkthrough by subsystemTip: Each subsystem lead gets a fixed slot. Ask for margins (mass, power, budget, schedule) on one slide each.30 minInfo
  5. +55′Interfaces and integrationTip: Look for interface definitions that are still TBD. They're the most common reason a CDR slips.10 minDiscuss
  6. +65′Break10 minBreak
  7. +75′Risks, margins and open tradesTip: Top risks with likelihood, consequence and mitigation. Any trade study still open at CDR needs a closure date.15 minDiscuss
  8. +90′Review item discrepancies (RIDs): disposition each oneTip: Accept, reject with reason, or convert to an action. Submit RIDs before the meeting so this is disposition, not discovery.15 minDiscuss
  9. +105′Board recommendationHas the design met this review's success criteria?Tip: The board chair decides; the vote shows where the board stands.5 minVote
  10. +110′Action items, owners and close dates10 minWrap-up

02Why it works

Built so the pdr and cdr design reviews ends on time, with everyone in it.

  • Updates stay short

    55 minutes of updates with a visible clock. In a video call the speaker is spotlighted and the room is muted, so nobody talks over them.

  • Discussion with a clock

    40 minutes of open floor with a countdown everyone can see, and a talk-balance meter so the loudest voice doesn't take all of it.

  • A break that ends

    Cameras pause and the timer keeps running, so the break finishes on time and everyone comes back together.

  • A vote the whole room sees

    One tap each on a phone, live bars on the screen. A tick shows who has voted, never what they chose.

  • Wraps up on time

    Decisions and actions are read back, the summary is already written, and a finish on time earns the confetti.

03In the room

What happens when you run it

The shared screen, every phone and the summary afterwards, drawn from this template.

  • LivePreliminary design review1 of 10

    Info

    Entrance criteria: are we ready to hold this review?

    4:

    On the shared screen

    A countdown for every block

    Each block runs on its own timer on the shared screen, and the video call changes with each block, so the meeting keeps to time.

  • 10:02

    Vote

    Has the design met this review's success criteria?

    • Yes: proceed
    • Proceed with listed actions
    • Not yet: hold a delta review

    On every phone

    Vote from every phone

    People scan the code or tap their invite and answer in the phone's browser. No app to install, no account to make.

  • Preliminary design review

    Summary

    Sent

    In short

    Decisions

    Actions

    Afterwards

    A summary that writes itself

    Decisions and actions are captured as they're said. When the meeting ends, everyone gets the summary, and one link shares it.

04How to run it

How to run this meeting, step by step

  1. 1

    Publish the entrance and success criteria with the review invitation, and deliver the data package early enough for reviewers to read it.

  2. 2

    Ask reviewers to submit RIDs before the meeting so the session disposes of them instead of discovering them.

  3. 3

    Timebox each subsystem walkthrough and keep the requirements trace on screen when gaps come up.

  4. 4

    For a CDR, rename the meeting and use the CDR success criteria. The structure stays the same.

  5. 5

    End with the board's recommendation and an action list. Agendiq's summary records the decision and every action owner.

05Questions

Questions people ask

Something else? Browse all agendas or open this one and change anything you like.

Still deciding?

Run your next meeting on it. Every new account gets Pro free for 14 days, no card.

  • Free forever after the trial
  • Your guests never sign up
  • Calls are never recorded
Start free
What is the difference between PDR and CDR?

A PDR shows the preliminary design meets requirements with acceptable risk and can proceed to detailed design. A CDR shows the detailed design is mature enough to proceed to fabrication, assembly, integration and test.

What is a RID in a design review?

A review item discrepancy: a formal comment from a reviewer about a problem in the design or data package. Each one is accepted, rejected with a reason, or turned into an action.

What is a constructability review?

The construction equivalent: builders review the design documents before bidding or construction to catch details that are hard to build, sequence or inspect. This agenda works for it with the walkthrough organized by building system.

Keep going

Goes well with

  • All agendas
  • Templates for construction
  • Run sheet75′
    8 blocks
    • 0:00Purpose, milestone and the decision we need today
    • 0:03Criteria recap: brief, budget, codes and standards
    • 0:08Design walkthrough by the lead designer
    • 0:23Review comments: issue, location, suggestion
    +4 more
    Agenda·Constructionpro
    Design review meetingA 75-minute milestone design review: criteria recap, walkthrough, a live comments board sorted by severity, an outcome vote and a decision record. 75 min
  • Run sheet60′
    8 blocks
    • 0:00Quorum, docket and decision rules
    • 0:03Status of changes approved last time
    • 0:08Change request 1: what, why and the requester's case
    • 0:13Impact matrix: cost, schedule, quality, safety, interfaces
    +4 more
    Agenda·Constructionpro
    Change control board meetingReview engineering change requests one at a time: impact on cost, schedule, quality and safety, a phone vote per request and a written decision record. 60 min
  • Presentation·Constructionstudio
    Architecture presentation templateA client design review deck: brief, site, concept, options, materials and next steps, with live feedback polls so every stakeholder weighs in. 45 min 15 slides
  • Run sheet75′
    11 blocks
    • 0:00Safety: incidents, near misses, upcoming high-risk work
    • 0:05Open items from the last meeting
    • 0:10Schedule: progress against baseline, critical path, look-ahe
    • 0:20Are we on track for the next milestone?
    +7 more
    Agenda·Constructionpro
    OAC meeting agendaThe weekly owner-architect-contractor meeting: safety, schedule, RFI and submittal logs, change events and a quick confidence vote on the next milestone. 75 min
  • Run sheet60′
    9 blocks
    • 0:00Safety: the hazard every crew should know about this week
    • 0:05Incidents, near misses and inspection findings since last we
    • 0:09Open items from last week
    • 0:14Schedule: where each trade stands against the plan
    +5 more
    Agenda·ConstructionFree
    Construction progress meeting agendaA weekly site meeting with every foreman: safety first, schedule by trade, a three-week look-ahead, coordination and a ready-for-next-week check. 60 min
  • Run sheet90′
    10 blocks
    • 0:00What closed out means under this contract
    • 0:03Substantial completion status and certificate
    • 0:10Punch list: open items by trade and area
    • 0:25Turnover documents: O&M manuals, warranties, record drawings
    +6 more
    Agenda·Constructionpro
    Construction closeout meetingA 90-minute closeout meeting that works through the turnover checklist, punch list and financial closeout, then captures lessons learned. 90 min
  • Run sheet10′
    5 blocks
    • 0:00Today's topic and why it matters on this site
    • 0:02Questions to the crew
    • 0:05Has anyone dealt with this hazard?
    • 0:07One hazard you'll watch for today
    +1 more
    Agenda·ConstructionFree
    Toolbox talk (tailgate meeting)A short crew safety talk on one topic tied to this site: ask questions, share experiences, and follow up on anything you can't answer. 10 min
  • Run sheet15′
    8 blocks
    • 0:00What is your task today? Break it into steps
    • 0:02What hazards are involved in each step?
    • 0:05Controls, where they are, who implements them; permit status
    • 0:08What other crews are working around you?
    +4 more
    Agenda·ConstructionFree
    Pre-task planning (PTP) meetingCPWR's pre-task planning questions before work starts (steps, hazards, controls, nearby crews, readiness), plus an end-of-shift post-task review. 15 min

Open it, make it yours, run it live.

Change anything in the editor. When you're ready, press Run live: everyone joins with a scan and answers on their phone.

Use this template More agendas

Free forever · Pro free for 14 days · No card needed · Guests never sign up

agendIQ

Meetings are boring. Let's make them fun. Plan the agenda, run it live with a call that follows it, and leave with decisions.

Product

  • Plan a meeting
  • How it works
  • Video calls
  • Interactive presentations
  • Meeting timer
  • Pricing
  • Integrations
  • API and webhooks
  • Join with a code
  • Sign in

Templates

  • Presentation templates
  • Games & quizzes
  • Workshop templates
  • Meeting kits
  • Weekly team meeting agenda
  • Retrospective meeting agenda
  • 1:1 meeting agenda
  • All 507 templates

Free tools

  • AI agenda maker
  • Meeting cost calculator
  • Video meetings
  • All free tools
  • Online timer
  • Wheel spinner
  • Random team generator
  • Word cloud generator
  • AI quiz generator
  • Question bank

Guides

  • Meeting games & icebreakers
  • How to write a meeting agenda
  • How to run effective meetings
  • Meeting minutes & action items
  • AI meeting assistant

Compare

  • Mentimeter alternative
  • Slido alternative
  • Free video calls compared
  • Google Meet alternative
  • Zoom alternative
  • Miro alternative
  • Otter.ai alternative
  • Kahoot alternatives
  • Gamma alternative

Trust

  • Privacy Policy
  • Terms of Service
  • Calls are never recorded
  • Votes stay anonymous
  • Guests never need an account
© 2026 Agendiq30 sectors · 507 templates · Participants never need an account

PDR and CDR design reviewsRuns with Pro

Use it