agendIQ
TemplatesPricing
Sign inStart free

Product

  • Agenda builder
  • Live meetings
  • Video calls
  • Presentations
  • Team and calendar
  • Notes for everyone

Free tools

  • Agenda maker
  • Online timer
  • Wheel spinner
  • Team generator
  • Word cloud generator
  • AI quiz generator
  • Meeting cost calculator
  • Meeting games
  • Guides
  • All free tools
  • Templates
  • Pricing
Sign inStart free

Free forever · Pro free for 14 days. No card needed.

  1. Home/
  2. Templates/
  3. Meeting kits/
  4. Fall prevention stand-down kit
Meeting kitConstructionSafety

Fall prevention stand-down kit

60 minutes 11 slides, 4 liveFree Free template

An hour-long stand-down: a fall protection talk, a check on phones, a site fall-hazard board, a harness inspection and a participation record.

Use this template See inside

Free to use and to run live. No card needed.

Share

We stopped work to talk about falls

Fall prevention safety stand-down

Title

In short

A safety stand-down is a planned pause in work so managers and workers can talk directly about one hazard. This kit covers falls in 60 minutes: an 11-slide talk with three check questions on phones, a fall-hazard board for this site, a harness inspection, a rescue plan and a participation record.
Time
60 minutes
People
5 to 200
Includes
Agenda, 11 slides, hazard board, record
Plan
Free

Updated October 4, 2026

What's in the kit

  1. 1We stopped work to talk about falls
  2. 2Falls are among the leading causes of death in construction. Every one of them could have been planned out.
  3. 3Plan. Provide. Train.
  4. 46 feet In US construction, fall protection is required at 6 feet above a lower level (29 CFR 1926.501).
  5. 5Where falls happen
  6. 6Check 1: at what height does US construction require fall protection?4 feet · 6 feet · 10 feet · 15 feet live
  7. 7Check 2: a hole in the floor is covered. What must the cover say?Nothing · HOLE or COVER · DANGER · KEEP OUT live
  8. 8Check 3: how much must a personal fall arrest anchor hold per worker?1,000 lb · 2,500 lb · 5,000 lb · 10,000 lb live
  9. 9Harness check, every time
  10. 10If someone fell and was hanging in a harness right now, what would we do? live
  11. 11Back to work. Safer than this morning.

The agenda

By the end of this meeting, the crew has named this site's fall hazards, inspected its fall equipment, agreed the rescue plan and has a participation record.

60 min · 8 blocks, drawn to scale Fits exactly
  1. Sign in: name, company, trade, 3 minutes 3
  2. Why we stopped work today, 5 minutes 5
  3. Fall protection talk and quick check, 12 minutesInfo 12
  4. Fall hazards on this site, 8 minutes 8
  5. Our worst three, and what we change this week, 10 minutesDiscuss 10
  6. Equipment inspection: harnesses, lanyards, anchors, 10 minutesInfo 10
  7. Rescue plan: who, how and how fast, 7 minutes 7
  8. Commitments and the participation record, 5 minutes 5
015304560 min
  1. +0′Sign in: name, company, tradeYour name, company and trade3 minCheck-in
  2. +3′Why we stopped work todayTip: A project manager or owner opens. Saying why you stopped work matters more than any slide.5 minInfo
  3. +8′Fall protection talk and quick checkTip: The slides play here. Read each check answer from the notes and explain it.12 minInfo
  4. +20′Fall hazards on this siteWhere could someone fall on this site? Be specific.8 minBrainstorm
  5. +28′Our worst three, and what we change this weekTip: Pick the three with the most risk, not the most notes. Give each change an owner.10 minDiscuss
  6. +38′Equipment inspection: harnesses, lanyards, anchorsTip: Hands-on. Pairs check each other's harness against the checklist slide.10 minInfo
  7. +48′Rescue plan: who, how and how fastTip: If someone is hanging in a harness, how do we get them down quickly? If there's no clear answer, that's an action.7 minDecide
  8. +55′Commitments and the participation recordOne thing you'll do differently tomorrow?5 minWrap-up

The board

Edges and openings
Open sides, floor holes, shafts, skylights
Ladders
Setup, condition, where they're used
Scaffolds and lifts
Planking, guardrails, access, tie-off
Roofs
Leading edges, slopes, weather
Everything else
Trucks, equipment, stairs, excavations

The follow-up email

Subject

Fall prevention stand-down: record and actions

Safety stand-down record

Company: 
Site: 
Date: 
Led by: 
Number of workers: (see the sign-in list in the summary below)

Topics covered:
- Fall protection talk and check questions
- Site fall hazards (see the board below)
- Harness, lanyard and anchor inspection
- Rescue plan

Top three hazards and what changes this week (owner, date):
1. 
2. 
3. 

Equipment taken out of service: 

Rescue plan agreed: 

If this was part of OSHA's National Safety Stand-Down, download your certificate of participation from OSHA's stand-down page and keep it with this record.

How to run it

  1. 1Stop work for an hour. Ask a manager or owner to open and say why.
  2. 2Everyone signs in by QR, which gives you the participation record and headcount.
  3. 3Give the fall protection talk, then run the three check questions on phones and explain each answer.
  4. 4Map this site's fall hazards on the board, dot-vote the worst three and agree changes with owners.
  5. 5Inspect harnesses in pairs, then agree the rescue plan. The record goes out by email for your files.

Questions people ask

What is a safety stand-down meeting?
A pause in work so the whole crew, including managers, can focus on one hazard. OSHA runs a National Safety Stand-Down to Prevent Falls in Construction every year, and many companies hold their own.
What are good safety stand-down topics?
Falls are the classic one. Others are struck-by hazards, trench safety, heat, electrical work, and any near miss your site has just had.
How do you get an OSHA stand-down certificate?
For the national stand-down, OSHA offers a certificate of participation you can download from its stand-down page after the event. Keep it with your own sign-in record.

Run it with your group

Free
  • Everyone answers on their phone, no app or sign-up
  • A timer for every block on the shared screen
  • Results, decisions and actions in the summary
Use this template

Free to use and to run live. No card needed.

Goes well with

All meeting kits
  • Toolbox talk: ladders

    Fifteen minutes. Sign in on your phone, three quick questions, then back to work.

    🪜
    FreeMeeting kit·Construction
    Toolbox talk kit with sign-in and quick checkA 15-minute toolbox talk with QR sign-in, a ready ladder-safety talk, a three-question check on phones and a signed record emailed after. 15 min 9 slides
  • Site safety orientation

    Before you start work on this site · 35 minutes

    🦺
    proPresentation·Construction
    Construction safety training presentationA site orientation deck for new workers: the Focus Four hazards, fall protection, ladders, PPE and electrical safety, with knowledge checks answered on phones. 35 min 15 slides
    • Headcount: name, company, trade1′
    • Today's plan: who's where, lifts, inspections, deliveries2′
    • Log it: work, delays, deliveries, safety3′
    • Anything stopping your crew today?1′
    proMeeting kit·Construction
    Construction daily huddle and logA ten-minute morning huddle where every trade posts work, delays and deliveries from their phone, and the daily log writes itself from the board. 10 min
  • Fall protection

    Edges, holes and harnesses: what keeps you from the ground

    FreeGame·Construction
    Fall protection toolbox talkThe 6-foot rule, guardrails, covers and personal fall arrest, with a harness check the crew does together and phone questions to finish. 15 min 15 slides
  • Tailgate meeting

    Ten minutes at the truck. Then we work.

    FreeMeeting kit·Construction
    Tailgate safety meeting for field crewsA ten-minute safety meeting at the truck for crews who move sites: pick a topic, check today's location for hazards, sign in by QR. 10 min 8 slides
  • Pre-task plan

    Steps, hazards, controls, sign-off. Before the first cut.

    proMeeting kit·Construction
    Pre-task planning meeting with hazard boardThe crew maps today's task step by step on a live board, names hazards and controls from their phones, and signs off before work starts. 20 min 9 slides
  • 52 toolbox talks

    One topic a week, 5 minutes a talk, answered on your phone

    FreeGame·Construction
    Toolbox talk topics: a year of weekly talks52 toolbox talk topics laid out week by week, a 5-minute talk format, and live crew questions that show who understood and who didn't. 10 min 13 slides
  • Ladder safety

    Set it right, check it first, climb with three points

    🪜
    FreeGame·Construction
    Ladder safety toolbox talkA 10-minute ladder talk on the 4-to-1 rule, inspection and three points of contact, with three phone check questions at the end. 10 min 13 slides

Open it, make it yours, run it live.

Change anything in the editor. When you're ready, press Present: everyone joins with a scan and answers on their phone.

  • Free forever
  • Pro free for 14 days
  • No card needed
  • Guests never need an account
Use this template More meeting kits
agendIQ

Meetings are boring. Let's make them fun. Plan the agenda, run it live with a call that follows it, and leave with decisions.

Product

  • Plan a meeting
  • How it works
  • Video calls
  • Interactive presentations
  • Meeting timer
  • Pricing
  • Join with a code
  • Sign in

Templates

  • Presentation templates
  • Games & quizzes
  • Workshop templates
  • Meeting kits
  • Weekly team meeting agenda
  • Retrospective meeting agenda
  • 1:1 meeting agenda
  • All 507 templates

Free tools

  • AI agenda maker
  • Meeting cost calculator
  • Video meetings
  • All free tools
  • Online timer
  • Wheel spinner
  • Random team generator
  • Word cloud generator
  • AI quiz generator

Guides

  • Meeting games & icebreakers
  • How to write a meeting agenda
  • How to run effective meetings
  • Meeting minutes & action items

Compare

  • Mentimeter alternative
  • Slido alternative
  • Free video calls compared
  • Google Meet alternative
  • Zoom alternative
  • Miro alternative
  • Otter.ai alternative
  • Kahoot alternatives
  • Gamma alternative

Trust

  • Privacy Policy
  • Terms of Service
  • Calls are never recorded
  • Votes stay anonymous
  • Data stored in the EU
© 2026 Agendiq30 sectors · 507 templates · Participants never need an account