agendIQ
TemplatesPricing
Sign inStart free

Product

  • Agenda builder
  • Live meetings
  • Video calls
  • Chair
  • Presentations
  • Integrations
  • Notes for everyone

Free tools

  • Agenda maker
  • Online timer
  • Wheel spinner
  • Team generator
  • Word cloud generator
  • AI quiz generator
  • Meeting cost calculator
  • Meeting games
  • Guides
  • All free tools
  • Templates
  • Pricing
Sign inStart free

Free forever · Pro free for 14 days. No card needed.

  1. Home/
  2. Templates/
  3. Workshops/
  4. HAZOP workshop

Workshop · Safety

HAZOP workshop

Work node by node through guideword deviations, with causes, consequences, safeguards and actions captured live from the whole team.

120 minutes7 blockspro Runs with Pro
Use this template

Free to open and edit. Running it live needs Pro, free for 14 days on every new account.

Deviation
Guideword + parameter: 'no flow'
Causes
What could make it happen?
Consequences
What happens if it does?
Safeguards
What protects us today?
Actions
What more is needed, and who owns it
HAZOP worksheet5 areas · 3 dots each for the vote

In short

A HAZOP (hazard and operability study) is a structured team review that applies guidewords such as no, more and less to a process's design intent to find hazards and operating problems. This template runs a two-hour node session on a live worksheet board, capturing causes, consequences, safeguards and actions with owners.

Time
2 hours per node session
People
5 to 10
Board
5-column HAZOP worksheet
Plan
Pro
Made forConstructionManufacturingHealth & safety· Updated October 4, 2026
Share

01Inside

What's inside

HAZOP worksheet with 5 areas, and a 120-minute agenda that runs it.

“For the current deviation, add a cause, a consequence, a safeguard or an action”

  • DeviationGuideword + parameter: 'no flow'
  • CausesWhat could make it happen?
  • ConsequencesWhat happens if it does?
  • SafeguardsWhat protects us today?
  • ActionsWhat more is needed, and who owns it

The agenda

By the end of this meeting, every deviation for this node is recorded with causes, consequences and safeguards, and actions have owners and due dates.

120 min · 7 blocks, drawn to scale Fits exactly
  1. Scope, node and design intent, 10 minutes 10
  2. Guidewords and parameters for this node, 5 minutes 5
  3. Work through each deviation, 60 minutesBrainstorm 60
  4. Break, 10 minutes 10
  5. Rank the deviations that need action, 15 minutes 15
  6. Actions, owners and due dates, 12 minutes 12
  7. Next node and session date, 8 minutes 8
0306090120 min
  1. +0′Scope, node and design intentTip: Name the node (a line, vessel or process step), its design intent and operating conditions. Have the drawings (P&IDs) on screen.10 minInfo
  2. +10′Guidewords and parameters for this nodeTip: Common guidewords: no, more, less, as well as, part of, reverse, other than. Apply them to parameters such as flow, pressure, temperature and level. Skip combinations that make no physical sense.5 minInfo
  3. +15′Work through each deviationTip: One deviation at a time. The team adds causes, consequences and existing safeguards from their phones; the chair tests each one and the scribe confirms the line. Record credible causes only.60 minBrainstorm
  4. +75′Break10 minBreak
  5. +85′Rank the deviations that need actionTip: Rank each deviation with your company's risk matrix. A dot vote can help the first pass, but the matrix decides.15 minDiscuss
  6. +100′Actions, owners and due datesTip: Each action is specific ('add high-level alarm on T-101') with an owner and a date. Record who closes it out and how.12 minDecide
  7. +112′Next node and session date8 minWrap-up

02In the room

What happens when you run it

The shared screen, every phone and the summary afterwards, drawn from this template.

  • HAZOP worksheet notes
    Deviation
    Causes
    Consequences
    Safeguards
    Actions

    On the shared screen

    A board the whole room fills

    Ideas land on the board from every phone, with no names on the notes. Then everyone dot-votes what matters most.

  • 10:02

    For the current deviation, add a cause, a consequence, a safeguard or an action

    DeviationCausesConsequencesSafeguards
    Your idea, in a sentence Add to Deviation

    On every phone

    Ideas from every phone at once

    People scan the code or tap their invite and answer in the phone's browser. No app to install, no account to make.

  • HAZOP session

    Summary

    Sent

    In short

    Top notes

    • 7 dots
    • 5 dots

    Afterwards

    A summary that writes itself

    Decisions and actions are captured as they're said. When the meeting ends, everyone gets the summary, and one link shares it.

03How to run it

How to run this meeting, step by step

  1. 1

    Bring a multidisciplinary team: an independent chair, a scribe, and people from process, operations, instrumentation and safety.

  2. 2

    Set the node and design intent, then apply each guideword to each parameter in turn.

  3. 3

    Capture causes, consequences, safeguards and actions on the board from phones; the scribe confirms each line before moving on.

  4. 4

    Rank with your risk matrix, assign actions with owners and dates, and keep sessions to a few hours to stay sharp.

04Questions

Questions people ask

Something else? Browse all workshops or open this one and change anything you like.

Still deciding?

Run your next meeting on it. Every new account gets Pro free for 14 days, no card.

  • Free forever after the trial
  • Your guests never sign up
  • Calls are never recorded
Start free
What is a HAZOP?

A systematic hazard and operability study. A multidisciplinary team takes each part (node) of a process and applies guidewords to its parameters to find deviations, their causes and consequences, and the safeguards needed. IEC 61882 is the international standard for it.

What are HAZOP guidewords?

Short words applied to a parameter to suggest a deviation: no, more, less, as well as, part of, reverse and other than. Some studies add early, late, before and after.

What's the difference between HAZID and HAZOP?

HAZID is a broader, earlier hazard identification, often at concept stage. HAZOP is a detailed, line-by-line study once the design and drawings are well developed.

Built from

The structure, wording and safety points in this template follow these published sources.

  • IEC: IEC 61882:2016 Hazard and operability studies (HAZOP), application guidewebstore.iec.ch

Keep going

Goes well with

  • All workshops
  • Templates for construction
  • Meeting kit·ConstructionFree
    Toolbox talk kit with sign-in and quick checkA 15-minute toolbox talk with QR sign-in, a ready ladder-safety talk, a three-question check on phones and a signed record emailed after. 15 min 10 slides
  • Presentation·Constructionpro
    Construction safety training presentationA site orientation deck for new workers: the Focus Four hazards, fall protection, ladders, PPE and electrical safety, with knowledge checks answered on phones. 35 min 15 slides
  • Game·ConstructionFree
    Trench and excavation safety talkCave-in protection, the 5-foot rule, ladders and spoil piles, plus the competent person's daily checklist and phone questions to finish. 15 min 13 slides
  • Game·ConstructionFree
    Toolbox talk topics: a year of weekly talks52 toolbox talk topics laid out week by week, a 5-minute talk format, and live crew questions that show who understood and who didn't. 10 min 13 slides
  • Run sheet10′
    6 blocks
    • 0:00Headcount: name, company, trade
    • 0:01Today's plan: who's where, lifts, inspections, deliveries
    • 0:03Log it: work, delays, deliveries, safety
    • 0:06Anything stopping your crew today?
    +2 more
    Meeting kit·Constructionpro
    Construction daily huddle and logA ten-minute morning huddle where every trade posts work, delays and deliveries from their phone, and the daily log writes itself from the board. 10 min
  • Game·ConstructionFree
    Construction safety meeting topics by monthTwelve monthly site safety themes, each with a 5-minute script in the speaker notes and a phone check, ready for your monthly site meeting. 15 min 19 slides
  • Game·ConstructionFree
    Ladder safety toolbox talkA 10-minute ladder talk on the 4-to-1 rule, inspection and three points of contact, with three phone check questions at the end. 10 min 13 slides
  • Meeting kit·ConstructionFree
    Fall prevention stand-down kitAn hour-long stand-down: a fall protection talk, a check on phones, a site fall-hazard board, a harness inspection and a participation record. 60 min 11 slides

Open it, make it yours, run it live.

Change anything in the editor. When you're ready, press Run live: everyone joins with a scan and answers on their phone.

Use this template More workshops

Free forever · Pro free for 14 days · No card needed · Guests never sign up

agendIQ

Meetings are boring. Let's make them fun. Plan the agenda, run it live with a call that follows it, and leave with decisions.

Product

  • Plan a meeting
  • How it works
  • Video calls
  • Interactive presentations
  • Meeting timer
  • Pricing
  • Integrations
  • API and webhooks
  • Join with a code
  • Sign in

Templates

  • Presentation templates
  • Games & quizzes
  • Workshop templates
  • Meeting kits
  • Weekly team meeting agenda
  • Retrospective meeting agenda
  • 1:1 meeting agenda
  • All 507 templates

Free tools

  • AI agenda maker
  • Meeting cost calculator
  • Video meetings
  • All free tools
  • Online timer
  • Wheel spinner
  • Random team generator
  • Word cloud generator
  • AI quiz generator
  • Question bank

Guides

  • Meeting games & icebreakers
  • How to write a meeting agenda
  • How to run effective meetings
  • Meeting minutes & action items
  • AI meeting assistant

Compare

  • Mentimeter alternative
  • Slido alternative
  • Free video calls compared
  • Google Meet alternative
  • Zoom alternative
  • Miro alternative
  • Otter.ai alternative
  • Kahoot alternatives
  • Gamma alternative

Trust

  • Privacy Policy
  • Terms of Service
  • Calls are never recorded
  • Votes stay anonymous
  • Guests never need an account
© 2026 Agendiq30 sectors · 507 templates · Participants never need an account

HAZOP workshopRuns with Pro

Use it